Closed complex consisting of 2 buildings (three entrances) of low construction, near Simeonovsko Shosse Blvd. The parking lot of the complex is located in the basement, and at ground level the playground and green areas will be available to the residents. Currently, building 1 has already been completed and with permission for use.
New luxury building in Vitosha district located in a quiet place. Construction of the building began in February 2021 and will be completed by the end of 2022. Modern residential building with fenced area and access control system. The building has 5 residential floors, and on the first and second level there are shops, on the third - an office.
There are other one and two bedroom apartments in the building. Permission for use is expected 16 months after the opening of the construction site. It is possible to buy garages and parking spaces. The heating will be on gas. Net living area: 58 sq.m.